Two tracks: ground-up hyperscale on natural gas, and the upgrade of low-latency facilities.
Adam Craig Hochfelder, co-founder and principal of Turks Capital Partners, is developing data centers with the firm, across the country. The work sits beside the real estate practice. It does not replace it.
The team includes data center development experts, including former engineers from Oracle and AWS. Those engineers are on the Turks Capital team. Oracle and Amazon Web Services are not partners, not customers, and not endorsers of this site.
“Former Oracle and AWS engineers” describes prior employment. It is not a partnership with, or an endorsement by, Oracle or Amazon Web Services.
Approach
Two tracks
Track one
Ground-up hyperscale
100 MW to 1 GW or more. On-site natural gas is the primary power. Single-tenant triple-net.
Track two
Acquire and upgrade
Existing facilities in major U.S. markets. Fiber or wireless at about 5 ms latency or less.
Ground-up hyperscale
New campuses from 100 MW to 1 GW or more. On-site natural gas generation is the primary power. The lease is single-tenant and triple-net, to credit tenants that need medium-to-high rack density. The users are training large AI models and running inference.
Acquire and upgrade
Existing facilities in major U.S. markets, where fiber or wireless connectivity is about 5 milliseconds of latency or less. The use is mission-critical systems and latency-sensitive AI inference.
The ranges above describe the thesis. They are not a published Turks Capital site, a measured campus the firm owns, or a named customer.
Power
Natural gas, until the bridge ends
Natural gas is the practical near-term primary power for the hyperscale track. It is a bridge until small modular reactors and the next generation of batteries mature.
Gas supplyLong-term fixed-price contract
→
On-site generationPrimary power for the hyperscale track
→
Power islandMicrogrid if the utility grid fails
→
Data hallDesigns target 99.999% uptime
Drawn so hydrogen can be blended in over time. A bridge until small modular reactors and next-generation batteries mature.
Designs target 99.999% uptime. Gas is not weather-dependent.
It can scale quickly for the spikes of AI training.
On site, it is a microgrid: a backstop if the utility grid fails.
It is energy-dense, so the power plant takes less land in tight markets such as Northern Virginia, Silicon Valley, and Dallas. Those cities are examples of constrained land. They are not a list of Turks Capital campuses.
Long-term fixed-price supply contracts make the cost predictable.
$150 billion a year
Estimated cost of blackouts to the U.S. economy. Source: U.S. Department of Energy.
$700–$1,000 per kW
Natural gas build cost, against $1,200–$1,500 per kW for solar plus storage. Source: Lazard, 2023 levelized cost of energy.
20–30% a year
Estimated growth in data center power demand from large AI models. Source: International Energy Agency.
The data center practice is built to carry a project from land through operation.
1Land
2Entitlement
3Power
4Construction
5Leasing
6Asset management
7Capital markets
Land acquisition
Zoning, entitlement, and development
Power-systems design and delivery
Construction
Leasing
Asset and property management
Financing and capital-markets execution
Prototype design, commissioning, and operations
Power contracts
Layouts from on-site generation through rack-level power
Liquid cooling
Lithium-ion and hydrogen battery storage
Modular, multi-phase design
Team
Experience of team members
The record below is prior work by members of the data center team, in earlier roles. It is not a list of Turks Capital completions, and it is not a list of current assets.
25+ years
In data center development, hyperscale design, construction, commissioning, and operations.
Prior role of team members.
$1B+
Hyperscale construction program for a confidential client, over seven years, on schedule and on budget.
Prior role of team members.
150 MW+
Greenfield campus designed for a global IT company, alongside Phase 1 of a campus above 100 MW.
Prior role of team members.
PUE 1.14
Trailing twelve months, as of 2012, on that confidential hyperscale program.
Prior role of team members.
LEED Gold
A 7 MW build-to-suit, under the LEED BD+C Data Center v4 program.
Prior role of team members.
1.5M+ sf
Confidential federal facilities designed by members of the team.
Prior role of team members.
Members of our data center team have more than 25 years in data center development, hyperscale design and construction, commissioning, and operations.
Members of our data center team have served as prime professional, construction manager, and commissioning agent on multiple campuses for a confidential hyperscale client: more than $1 billion of construction over seven years, on schedule and on budget, with a trailing 12-month power usage effectiveness of 1.14 as of 2012.
Members of our data center team have designed a greenfield campus of more than 150 MW, above $1 billion, and Phase 1 of a campus of more than 100 MW, above $600 million, for global IT companies.
Members of our data center team have designed two 36 MW Tier II greenfield facilities with more than 72 MW of combined critical IT capacity, above $500 million, with site planning and design completed in 12 weeks.
Members of our data center team have designed a data center that uses natural gas as primary, backup, or temporary power: 2N+1 redundancy, a power island able to run independently of the grid, closed-loop non-evaporative cooling, about 18 MW in total and 7.5 MW of critical IT, drawn for hydrogen blending over time.
Members of our data center team have done the mechanical, electrical, and plumbing design for a 130,000-square-foot, 7 MW build-to-suit data center for a global financial data company. The building earned LEED Gold under the LEED BD+C Data Center v4 program.
Members of our data center team have prepared a master plan for an 83-acre, 60 MW campus and the design of its first building: 150,000 square feet, 10.5 MW, Uptime Tier III colocation.
Members of our data center team have designed a 155,000-square-foot research and development data center, about 40 MW electrical, with a design power usage effectiveness of 1.2 that has operated closer to 1.09.
Members of our data center team have delivered a rapid-deployment program of 2.4 MW 2N buildings, LEED and Tier III, 180 days from pad-ready to fully operational.
Members of our data center team have converted a warehouse to colocation, delivering 7.2 MW across about 120,000 square feet in about a year, and have converted 135,000 square feet of shell space into data halls with about 30 MW of UPS power.
Members of our data center team have been prime professional and mechanical, electrical, and plumbing engineer for a national telecom carrier’s North American switch and colocation rollout during the dot-com buildout. An optimization program in that work cut monthly operating expense by $170,000.
Members of our data center team have designed confidential federal facilities totaling more than 1.5 million square feet.
Team experience reflects prior roles of individual members. It does not describe a Turks Capital
completion or a current asset. “Former Oracle and AWS engineers” describes prior employment. It is not a partnership with, or an endorsement by, Oracle or Amazon Web Services.
Public record
What Turks Capital has named
Specific sites, megawatts, delivery partners, customers, and individual team names are not listed. They will appear here when they can be published, each with a source.